The team weaving new architectural shingles through a valley over synthetic underlayment during a shingle roof replacement in Mission Viejo
A new roof is one of the biggest projects a homeowner takes on, and most people have never watched one go on from start to finish. Knowing what happens each day makes the process easier to plan around.
The photo above is from a shingle roof replacement the team recently finished in Mission Viejo. Here is what that work looked like, step by step.
Before the Work Starts
1. The Estimate
You get a clear written price that covers the whole job, including the decking, vents and flashing. Under the Fox Five Guarantee, that price is locked and decking is covered.
2. The Permit
We pull the permit with the city and take care of the inspections, so you don't need to schedule anything or be home for them.
On the Roof
1. Tear-Off
The team removes the old roof down to the decking. This is when we can see the condition of the wood and anything the old roof was hiding.
2. New Decking
Damaged or worn decking is replaced so the new roof has a solid base. On the Mission Viejo job, the photos show new decking going down before anything else.
3. Underlayment
Once the decking passes the sheathing inspection, the team rolls out synthetic underlayment. On this job we used Titanium UDL50. This layer is the roof's second line of defense against water.
4. Shingles and Valleys
Architectural shingles go on next. In the photo above, the team is weaving shingles through a valley, where two slopes meet and the most water runs.
5. Vents, Pipes and Caps
The pipe vents get new flashing, the roof vents are installed, and the hips and ridges are capped to finish the roof.
After the Roof Is On
The team cleans up the site, and the city does the final inspection. You get your warranty information and job photos in a Google Drive link.
Every roof replacement we install is backed by the Fox Five Guarantee.
Planning Your Roof Replacement
The forecast for Orange County stays dry through the middle of next week, with only a slight chance of showers late in the week. Planning a roof replacement during a dry stretch gives the team the best window to open the roof and close it up again.
If your roof is getting older, Call Fox Roofing Company today to schedule an estimate. We will go over your options and give you a clear price.